Innovative Architectural Processes: Expert Advice from Erdlen Architektur

  • Autorenbild: elisa erdlen
    elisa erdlen
  • 12. Apr. 2025
  • 3 Min. Lesezeit

Aktualisiert: 23. Sept. 2025

Innovative Architectural Processes: Expert Advice from Erdlen Architektur



As the founder of Erdlen Architektur, a Basel-based firm specializing in efficient construction management, I draw on over a decade of experience as a project manager at leading practices like Oliv Architekten and Takenaka to deliver streamlined, high-performance architectural solutions. My approach is rooted in Swiss precision—adhering strictly to SIA standards (e.g., SIA 118 for contractual clarity and SIA 269 for existing structures)—while embracing cutting-edge tools like BIM-PLM integration and AI-driven generative design. Below, I share actionable expert advice on optimizing architectural processes, tailored for high-end projects where efficiency meets innovation. This guidance focuses on the full lifecycle: from conceptual design to site execution, ensuring cost savings, sustainability, and superior outcomes.


1. Master the Early Conceptual Phase: Prioritize SIA-Aligned Planning for Long-Term Gains   Decisions made in the conceptual stage influence up to 80% of a project's final performance, including energy use and costs. Start by mapping your project against SIA phases (SIA 112: design stages from feasibility to tendering) to create a structured timeline with clear milestones.

  • Expert Tip: Use parametric modeling in tools like Rhino or Grasshopper to simulate variables early. For instance, input site-specific data (climate, topography) to optimize massing for daylighting and thermal performance. In one recent Basel residential project, this reduced energy loads by 25% before detailed drawings began.

  • Optimization Hack: Conduct a quick sensitivity analysis—vary window-to-wall ratios or orientations by 10-15% increments—to identify low-hanging fruit. Avoid trial-and-error; leverage genetic algorithms (via plugins like Ladybug) to evolve 50+ iterations in under an hour, aligning with SIA 261 for structural safety.

   By front-loading this, you minimize revisions later, saving 15-20% on overall timelines.


2. Integrate BIM and PLM for Seamless Design-to-Execution Workflows  

At Erdlen Architektur, we fuse Building Information Modeling (BIM) with Product Lifecycle Management (PLM) for real-time oversight, enabling holistic optimization from blueprint to handover.

  • Expert Tip: Adopt a platform-centric approach to track changes across phases. This ensures compliance with SIA 117 (tendering procedures) by auto-generating accurate bills of quantities, reducing bidding discrepancies by up to 30%.

  • Optimization Hack: Embed AI for predictive analytics—tools like Autodesk's generative design can explore thousands of facade variations, prioritizing those that cut material waste while meeting SIA 260 sustainability baselines. In a recent high-end office retrofit, this shaved 18% off procurement costs through optimized modular components.

   Result: Projects complete 20-40% faster, with fewer RFIs (requests for information).


3. Leverage AI and Topology Optimization for Innovative, Sustainable Forms: 

Topology optimization, inspired by natural structures like bones, refines forms for minimal material use without compromising strength, directly supporting SIA 266 (masonry and load-bearing standards).

  • Expert Tip: Implement digital twins for real-time site monitoring—drones and IoT sensors feed data into BIM models, flagging delays in ventilation or cladding installation per SIA 112 timelines.

  • Optimization Hack: Use clear CTAs in tender docs (e.g., "Submit optimized bids via portal by [date]") to foster collaboration. Client testimonials from our Oliv-era projects highlight how this builds trust, reducing disputes by 50%. For high-end segments, include a "process visualization" dashboard showing phased efficiencies.

5. Foster Continuous Learning: The Role of Knowledge Sharing in Innovation   Stay ahead by treating your firm as a learning ecosystem. Our blog at erdlenarchitektur.ch shares SIA updates and case studies, like optimizing folded facades for self-shading.

  • Expert Tip: Dedicate 10% of project time to post-mortems—analyze what optimized energy (e.g., via Ecotect simulations) and what didn't. Share anonymized insights on platforms like ArchDaily to attract talent and clients.

  • Optimization Hack: Experiment with swarm-based algorithms (ant colony for circulation paths) in education workflows, as seen in Taubman College's approaches. This equips teams for decarbonized designs, targeting <1% thermal discomfort.

Final Thoughts: Efficiency as the New Creativity.

At Erdlen Architektur, innovative processes aren't add-ons—they're the foundation for resilient, client-centric architecture. By optimizing holistically, we deliver projects that are 20-30% more efficient, fully SIA-compliant, and poised for Switzerland's sustainable future.


Ready to transform your next build? Contact us at eee@erdlenarchitektur.ch to discuss a tailored consultation—let's turn constraints into breakthroughs.

 
 
 